| |
 |
At
the busy intersection of 8th Avenue and 42nd Street in New York City,
a group of buildings had been demolished as part of an excavation
project for a new building, which was to be erected on the site. Asbestos
materials had contaminated the soil during the demolition, and had
to be removed before new construction could begin. Pinnacle's Asbestos-certified
personnel loaded the soil onto trucks, which passed through special
washing stations on-site to ensure that no contamination would occur
during the transportation of materials to the special land-fill areas.
The entire project was completed within 4 weeks. The process adhered
strictly to site regulations, and caused little or no traffic disruption. |
hen
soil becomes contaminated, the only resolution is often to remove
it from the environment. In such situations Pinnacle provides the
licensed operators and heavy equipment necessary to fully contain
and remove soil contaminated with asbestos, lead, heavy metals, acids,
organic chemical residues and other hazardous materials. |
 |
|