nce
asbestos has been removed from a building framework, it has to be
replaced. Specially trained Pinnacle technicians re-spray the entire
building shell, including decking beams and columns, with new, non-asbestos
fire-proofing material. Where appropriate, non-asbestos fire-resistant
caulking is also applied to floor-to-floor pipe sleeves in order to
seal each floor of the building against the potential spread of fire.
Necessary repair procedures or asbestos removal involving water or
steam conduits inevitably means that pipes require re-insulation.
Pinnacle offers the experience to handle not only the repair and/or
removal phase of a project, but also the expertise to immediately
execute the next phase of providing new, non-asbestos insulation. |
| |
During
a large renovation project at 9 West 57th Street in Manhattan, Pinnacle
crews removed spray-on asbestos fire-proofing material from 6 floors
of the building, sealed all openings with special fire-stopping caulking,
and applied new, non-asbestos fire-proofing material — all within
an extremely tight schedule, which had been predetermined by the renovation
contractor. |
|